Return to Home
GEOMAX / ARCHIVE
Facade Engineering Portfolio

Project Deliverables & Case Studies.

Explore a curated selection of our 250+ delivered projects. From unitized split-mullion high-rise towers to 3D parametric diagrids, inspect full shop drawing packages, wind load statics, and CNC cutting matrices.

The Lumina Financial Tower
Unitized Curtain Wall Detailing
Marina Bay • Singapore • 2024

The Lumina Financial Tower

Shop drawings and structural statics for the integral unitized split-mullion stack joint, engineered with three pressure-equalized rainscreen gasket chambers to eliminate wet silicone seals.

Profile Detailing: Split-Mullion StackWind Load Peak: 3.45 kPaTolerance: ±0.1mm CNC NotchSeismic Drift: ±25mm Joint Travel
Inspect Engineering Dossier
The Orbit Complex & Atrium
Parametric Diagrid Node Engineering
Tech Corridor • Bangalore • 2024

The Orbit Complex & Atrium

Detailed 3D parametric node geometry connecting tubular steel diagrid struts into 4-way articulated stainless spider glass fittings, transferring load paths with zero site recuts.

Node Detailing: 420 Unique Solid CastsGlass Support: 4-Way Articulated SpiderPre-Tension: 85 kN Tendon CablesSurveyed Fit: ±1.5mm Laser Checked
Inspect Engineering Dossier
Vertex Innovation Headquarters
Rainscreen Subframe & Bracket Statics
Bandra Kurla Complex • Mumbai • 2023

Vertex Innovation Headquarters

Engineered continuous slotted aluminum anchor brackets and phenolic thermal isolation pads supporting ventilated terracotta rainscreens and motorized acoustic solar louvers.

Anchor Type: Heavy Slotted L-BracketCavity Width: 600mm VentilatedAcoustic Rw: 46 dB RatingThermal Barrier: Phenolic Isolation Shim
Inspect Engineering Dossier
Solaris Central Terminal
Monumental Skylight Gutter Detailing
Aerotropolis • Hyderabad • 2023

Solaris Central Terminal

Detailed barrel vault skylight support joints with slotted stainless steel toggle anchors and secondary condensation drainage channels designed to prevent tropical moisture intrusion.

Span Detailing: 36m Column-Free TrussAnchor Pad: Low-Friction PTFE ToggleDrainage: Double Gutter EPDM LineLive Load Cap: 450 kg/m² Verified
Inspect Engineering Dossier